Sealey SAC05020 User Manual Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 4
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
5. MAINTENANCE
In order to keep the compressor in good working condition, periodic maintenance is essential.
WARNING! Before performing any maintenance operation, switch off the compressor, disconnect from electrical supply and
release all air from the tank.
IMPORTANT! Failure to carry out maintenance tasks may invalidate
the warranty on your compressor.
5.1. Operations to be carried out after the first 5 working hours:
a) Check that all nuts/bolts are tight, particularly those retaining the
crankcase and cylinder heads.
5.2. Operations to be carried out daily:
a) Drain condensation by opening the valve located under the tank
(fig.4). Place a container under the valve to collect any condensation.
Tip the compressor slightly towards the drain valve to ensure all
condensation drains. Close valve after draining condensation and
dispose of it safely.
b) Regularly clean dirt and dust away from the safety devices with a
clean cloth or blowing with low pressure compressed air.
Generally keep the compressor clean.
5.3. Operations to be carried out every 100 hours:
(Or more frequently, if the compressor operates in a very dusty
atmosphere)
Clean Air Filter
a) Ensure the power is off and the tank has been vented. Remove the cowling from the motor by removing the four retaining screws
NOTE! When removing the cowling, care should be taken not to inadvertently disconnect the wires from the switch.
b) Remove the filter element by pulling the filter cover from the housing (fig.3).
Clean and replace the filter element. Snap the cover back into place.
5.4. Operations to be carried out every 200 hours:
a) Check the automatic cut-out at maximum pressure, and the automatic cut-in at 2 bar below maximum pressure.
b) Replace air filter.
5.5. Operations to be carried out every 400 hours:
a) Check all fittings and electrical connections.
b) Inspect pressure tank inside and out for damage or corrosion.
Original Language Version
SAC05020 Issue: 2 - 21/10/11
fig.3
5.6. Scheduled maintenance table
Maintenance
Operations
Daily
100 hrs.
200 hrs.
400 hrs.
Drain condensation
Clean intake filter
General cleaning of compressor
Internal & external inspection of
tank
Replace air filter
Check tube fittings and electrical
connections
fig.5
1
2
fig.4
Page view 2
1 2 3 4

Comments to this Manuals

No comments